Asked by Ermina Coronas on Apr 25, 2024

Thrall Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours.The company based its predetermined overhead rate for the current year on the following data: Thrall Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours.The company based its predetermined overhead rate for the current year on the following data:   Recently Job K125 was completed and required 160 machine-hours. Required: Calculate the amount of overhead applied to Job K125. Recently Job K125 was completed and required 160 machine-hours.
Required:
Calculate the amount of overhead applied to Job K125.

Predetermined Overhead Rate

A rate used to allocate manufacturing overhead to individual products or job orders, based on a set formula prior to the start of a period.

Manufacturing Overhead

Indirect costs related to the production process, such as equipment maintenance and factory rent.

  • Implement fixed overhead rates to assess manufacturing overhead for individual tasks.