Jack's Refrigeration Repair is under contract to repair, recondition, and/or refurbish commercial and industrial icemakers from restaurants, seafood processors, and similar organizations. Jack currently has five jobs to be scheduled, shown in the order in which they arrived.
 Job  Processing Time (hours)  Due (hours) V2050W1035X5090Y1535Z5575\begin{array} { | c | c | c | } \hline \text { Job } & \text { Processing Time (hours) } & \text { Due (hours) } \\\hline \mathrm { V } & 20 & 50 \\\hline \mathrm { W } & 10 & 35 \\\hline \mathrm { X } & 50 & 90 \\\hline \mathrm { Y } & 15 & 35 \\\hline \mathrm { Z } & 55 & 75 \\\hline\end{array} Job VWXYZ Processing Time (hours) 2010501555 Due (hours) 5035903575 a. Complete the following table. (Show your supporting calculations below).
b. Which dispatching rule has the best score for flow time?
c. Which dispatching rule has the best score for work-in-process (jobs in the system)?
d. Which dispatching rule has the best score for lateness?
e. What dispatching rule would you select? Support your decision.
 Dispatching  Rule  Job Sequence  Average Flow  Time  Average  Number of  Jobs  Average  Lateness  FCFS  SPT  EDD  CR \begin{array} { | c | c | c | c | c | } \hline \begin{array} { c } \text { Dispatching } \\\text { Rule }\end{array} & \text { Job Sequence } & \begin{array} { c } \text { Average Flow } \\\text { Time }\end{array} & \begin{array} { c } \text { Average } \\\text { Number of } \\\text { Jobs }\end{array} & \begin{array} { c } \text { Average } \\\text { Lateness }\end{array} \\\hline \text { FCFS } & & & & \\\hline \text { SPT } & & & & \\\hline \text { EDD } & & & & \\\hline \text { CR } & & & & \\\hline\end{array} Dispatching  Rule  FCFS  SPT  EDD  CR  Job Sequence  Average Flow  Time  Average  Number of  Jobs  Average  Lateness 

Commercial Icemakers

Machines designed for industrial or commercial use that produce large quantities of ice cubes or flakes for various business needs, such as in restaurants, bars, and healthcare facilities.

Industrial Icemakers

Machines specifically designed for large-scale production of ice, commonly used in industries such as food, hospitality, and healthcare.

Dispatching Rule

relates to guidelines or criteria used in manufacturing and operations management to prioritize and allocate tasks or resources, optimizing workflow and productivity.

  • Understand key dispatching rules and their application in scheduling.
  • Evaluate the performance of different scheduling rules based on average flow time, work-in-process, lateness, and makespan.
verifed

Verified Answer

ZK
Zybrea KnightMay 05, 2024
Final Answer :
(a) A summary of calculations appears in the table below.
 Dispatching  Rule  Job Sequence  Average Flow  Time  Average  Number of  Jobs  Average  Lateness  FCFS V,W,X,Y,Z752.5027 SPT  W, Y, V, X, Z 652.1716 EDD  W, Y, V, Z, X 662.2017 CR  Z, X, Y, V, W 1143.8061\begin{array} { | l | c | c | c | c | } \hline\begin{array} { c } \text { Dispatching } \\\text { Rule }\end{array} & \text { Job Sequence } & \begin{array} { c } \text { Average Flow } \\\text { Time }\end{array} & \begin{array} { c } \text { Average } \\\text { Number of } \\\text { Jobs }\end{array} & \begin{array} { c } \text { Average } \\\text { Lateness }\end{array} \\\hline \text { FCFS } & \mathrm { V } , \mathrm { W } , \mathrm { X } , \mathrm { Y } , \mathrm { Z } & 75 & 2.50 & 27 \\\hline \text { SPT } & \text { W, Y, V, X, Z } & 65 & 2.17 & 16 \\\hline \text { EDD } & \text { W, Y, V, Z, X } & 66 & 2.20 & 17 \\\hline \text { CR } & \text { Z, X, Y, V, W } & 114 & 3.80 & 61 \\\hline\end{array} Dispatching  Rule  FCFS  SPT  EDD  CR  Job Sequence V,W,X,Y,Z W, Y, V, X, Z  W, Y, V, Z, X  Z, X, Y, V, W  Average Flow  Time 756566114 Average  Number of  Jobs 2.502.172.203.80 Average  Lateness 27161761 (b,c,d) SPT is best on all three criteria: flow time, work-in-process, and lateness. (e) Most students will select SPT as quite obvious, but EDD is a close second in all criteria. Supporting calculations for each priority rule appear in the tables below.  SPT  Machine  Due Date  Flow Time  Late W1035100Y1535250V2050450X5090955 Z 557515075 Total 32580 Average 6516\begin{array}{|c|c|c|c|c|}\hline \text { SPT } & \text { Machine } & \text { Due Date } & \text { Flow Time } & \text { Late } \\\hline \mathrm{W} & 10 & 35 & 10 & 0 \\\hline \mathrm{Y} & 15 & 35 & 25 & 0 \\\hline \mathrm{V} & 20 & 50 & 45 & 0 \\\hline \mathrm{X} & 50 & 90 & 95 & 5 \\\hline \text { Z } & 55 & 75 & 150 & 75 \\\hline \text { Total } & & & 325 & 80 \\\hline \text { Average } & & & 65 & 16 \\\hline\end{array} SPT WYVX Z  Total  Average  Machine 1015205055 Due Date 3535509075 Flow Time 1025459515032565 Late 0005758016
 Average # jobs in system =2.17\text { Average } \# \text { jobs in system }=2.17 Average # jobs in system =2.17

 FCFS  Machinel  Due Date  Flow Time  Late V2050200W1035300X5090800Y15359560 Z 557515075 Total 375135 Average 7527\begin{array}{|c|c|c|c|c|}\hline \text { FCFS } & \text { Machinel } & \text { Due Date } & \text { Flow Time } & \text { Late } \\\hline \mathrm{V} & 20 & 50 & 20 & 0 \\\hline \mathrm{W} & 10 & 35 & 30 & 0 \\\hline \mathrm{X} & 50 & 90 & 80 & 0 \\\hline \mathrm{Y} & 15 & 35 & 95 & 60 \\\hline \text { Z } & 55 & 75 & 150 & 75 \\\hline \text { Total } & & & 375 & 135 \\\hline \text { Average } & & & 75 & 27 \\\hline\end{array} FCFS VWXY Z  Total  Average  Machinel 2010501555 Due Date 5035903575 Flow Time 2030809515037575 Late 000607513527
 Average # jobs in system =2.5\text { Average \# jobs in system }=2.5 Average # jobs in system =2.5  EDD  Machine l  Due Date  Flow Time  Late W1035100Y1535250V2050450Z557510025X509015060 Total 33085 Average 6617\begin{array}{|c|c|c|c|c|}\hline \text { EDD } & \text { Machine l } & \text { Due Date } & \text { Flow Time } & \text { Late } \\\hline \mathrm{W} & 10 & 35 & 10 & 0 \\\hline \mathrm{Y} & 15 & 35 & 25 & 0 \\\hline \mathrm{V} & 20 & 50 & 45 & 0 \\\hline \mathrm{Z} & 55 & 75 & 100 & 25 \\\hline \mathrm{X} & 50 & 90 & 150 & 60 \\\hline \text { Total } & & & 330 & 85 \\\hline \text { Average } & & & 66 & 17 \\\hline\end{array} EDD WYVZX Total  Average  Machine l 1015205550 Due Date 3535507590 Flow Time 10254510015033066 Late 00025608517
 Average # jobs in system =2.20\text { Average } \# \text { jobs in system }=2.20 Average # jobs in system =2.20

 CR  Machinel  Due Date  CR  Flow Time  Late  Z 55751.36550X50901.810515Y15352.3312085V20502.514090W10353.5150115 Total 570305 Average 1146\begin{array}{|c|c|c|c|c|c|}\hline \text { CR } & \text { Machinel } & \text { Due Date } & \text { CR } & \text { Flow Time } & \text { Late } \\\hline \text { Z } & 55 & 75 & 1.36 & 55 & 0 \\\hline \mathrm{X} & 50 & 90 & 1.8 & 105 & 15 \\\hline \mathrm{Y} & 15 & 35 & 2.33 & 120 & 85 \\\hline \mathrm{V} & 20 & 50 & 2.5 & 140 & 90 \\\hline \mathrm{W} & 10 & 35 & 3.5 & 150 & 115 \\\hline \text { Total } & & & & 570 & 305 \\\hline \text { Average } & & & & 114 & 6 \\\hline\end{array} CR  Z XYVW Total  Average  Machinel 5550152010 Due Date 7590355035 CR 1.361.82.332.53.5 Flow Time 55105120140150570114 Late 01585901153056
 Average # jobs in system =3.80\text { Average \# jobs in system }=3.80 Average # jobs in system =3.80