Marciante Corporation has two production departments, Casting and Finishing. The company uses a job-order costing system and computes a predetermined overhead rate in each production department. The Casting Department's predetermined overhead rate is based on machine-hours and the Finishing Department's predetermined overhead rate is based on direct labor-hours. At the beginning of the current year, the company had made the following estimates: Marciante Corporation has two production departments, Casting and Finishing. The company uses a job-order costing system and computes a predetermined overhead rate in each production department. The Casting Department's predetermined overhead rate is based on machine-hours and the Finishing Department's predetermined overhead rate is based on direct labor-hours. At the beginning of the current year, the company had made the following estimates:   The estimated total manufacturing overhead for the Finishing Department is closest to: A)  $71,500 B)  $52,000 C)  $34,794 D)  $19,500 The estimated total manufacturing overhead for the Finishing Department is closest to:

A) $71,500
B) $52,000
C) $34,794
D) $19,500

Manufacturing Overhead

All indirect costs associated with the manufacturing process, including costs related to indirect labor, materials, and factory operations.

Finishing Department

The section in a manufacturing process where products undergo final touches before being considered finished goods.

Predetermined Overhead Rate

An upfront calculated rate for assigning manufacturing overhead costs to products or job orders, based on estimated expenses and levels of activity.

  • Determine the cumulative forecasted manufacturing overhead across production divisions.
verifed

Verified Answer

DK
Dylan KloseMay 10, 2024
Final Answer :
A
Explanation :
The estimated total manufacturing overhead for the Finishing Department can be calculated as follows:

Predetermined overhead rate for Finishing Department = Estimated total manufacturing overhead for Finishing Department / Estimated total direct labor-hours for Finishing Department
= $317,500 / 25,300
= $12.55 per direct labor-hour

Estimated total manufacturing overhead for Finishing Department = Predetermined overhead rate for Finishing Department x Estimated total direct labor-hours for Finishing Department
= $12.55 per direct labor-hour x 5,700 direct labor-hours
= $71,535

Therefore, the estimated total manufacturing overhead for the Finishing Department is closest to $71,500 (option A).