In activity-based costing, a plantwide overhead rate is used to apply overhead to products.

Plantwide Overhead Rate

A single predetermined overhead rate that is used throughout a plant.

  • Distinguish between conventional costing methods and activity-based costing techniques.
verifed

Verified Answer

AH
Autumn HamiltonMay 31, 2024
Final Answer :
False
Explanation :
In activity-based costing, overhead is applied to products based on their use of different activities, not using a plantwide overhead rate.