Asked by Johnny Gomez on Jun 25, 2024

verifed

Verified

Which one of the following would be the same total amount on a flexible budget and a static budget if the activity level is different for the two types of budgets?

A) Direct materials cost
B) Direct labor cost
C) Variable manufacturing overhead
D) Fixed manufacturing overhead

Flexible Budget

A flexible budget adjusts according to the actual levels of activity experienced, allowing for more accurate comparisons of budgeted to actual performance.

Static Budget

A budget that is set for a specific level of activity and does not change or adjust with the actual level of activity achieved.

Fixed Manufacturing Overhead

The set costs involved in producing a product that do not change with the level of production, such as rent, salaries, and utilities.

  • Master the concept of flexible budgeting and its adaptability to diverse activity intensities.
verifed

Verified Answer

ZK
Zybrea KnightJul 01, 2024
Final Answer :
D
Explanation :
Fixed manufacturing overhead costs will remain the same regardless of changes in the activity level, so the total amount for fixed manufacturing overhead will be the same on both a flexible and static budget.