Which of the following would most likely use a job order costing system?

A) paper mill
B) swimming pool installer
C) company that manufactures chlorine for swimming pools
D) oil refinery

Job Order Costing System

A method of assigning production costs to individual units or projects based on the specific materials and labor they require.

  • Discern the relevance of job order cost accounting systems in assorted organizational domains, not solely within manufacturing environments.
verifed

Verified Answer

AP
Aspen Poole

Mar 10, 2024

Final Answer :
B
Explanation :
Swimming pool installers typically use a job order costing system because each installation project is unique and requires different materials, labor, and overhead costs. This system allows for the detailed tracking of costs associated with specific jobs.