Which of the following statements is NOT correct concerning the Manufacturing Overhead Budget?

A) The Manufacturing Overhead Budget provides a schedule of all costs of production other than direct materials and labor costs.
B) The Manufacturing Overhead Budget shows only the variable portion of manufacturing overhead.
C) The Manufacturing Overhead Budget shows the expected cash disbursements for manufacturing overhead.
D) The Manufacturing Overhead Budget is prepared after the Sales Budget.

Manufacturing Overhead Budget

A financial plan that estimates the indirect costs associated with manufacturing, including utilities, maintenance, and rent.

Direct Materials

Raw materials that are directly incorporated into a finished product and can be easily traced to it.

Direct Labor

Labor costs directly attributable to the production of goods or services, such as wages for assembly line workers.

  • Grasp the concept and construction of various budgets, including sales, manufacturing overhead, cash, direct materials, and production budgets.
  • Recognize the sequence and interconnections between different components of the master budget.
verifed

Verified Answer

AG
Aba Gyesiwah ArhinJun 13, 2024
Final Answer :
B
Explanation :
The Manufacturing Overhead Budget shows both the variable and fixed portions of manufacturing overhead. It also includes expected cash disbursements for manufacturing overhead. The Manufacturing Overhead Budget is prepared before the Production Budget, as it is used to determine total production costs.