Suppose that the introduction of a preventive maintenance program is deemed cost effective. Which of the following is most likely true if the cost to actually perform preventive maintenance is very expensive?

A) high standard deviation in MTBF
B) low standard deviation in MTBF
C) low Cost to Repair
D) Repairs carry little non-monetary consequences.
E) The system never fails.

Preventive Maintenance Program

A schedule of planned maintenance actions aimed at preventing breakdowns and failures of equipment before they occur.

Cost Effective

Cost-effective refers to an action that provides the best possible outcome for the least amount of money, maximizing the benefits relative to its costs.

  • Identify the critical factors that make a system a good candidate for preventive maintenance.
verifed

Verified Answer

TM
Tannya MunozJul 10, 2024
Final Answer :
B
Explanation :
If the cost to actually perform preventive maintenance is very expensive, it is likely that the maintenance will be performed less frequently, resulting in a more consistent and predictable Mean Time Between Failures (MTBF). This would lead to a lower standard deviation in MTBF, making option B the best choice. The other options are not directly related to the cost of performing preventive maintenance.