José works in a toy manufacturing plant. The wooden toy he fabricates requires three steps: cutting, assembly, and painting. Assembly takes two minutes longer than half the cutting time, and painting requires half a minute longer than half the assembly time. How long does each step require if José made 72 units in 42 hours of work?
Toy Manufacturing
The process of designing, producing, and distributing toys.
Assembly
The process of putting together components or parts to form a complete product or system.
Painting
The process or art of using paint to create a picture, design, or decorative coating on a surface.
- Tackle practical challenges by establishing and solving linear equation systems.
- Understand the relationship between equations, their graphs, and the solutions to the equations.
Verified Answer
AB
Archit BatraMay 15, 2024
Final Answer :
Cutting = 18 minutes; Assembly = 11 minutes; Painting = 6 minutes