Asked by Rachel Romero on May 02, 2024

verifed

Verified

In activity-based costing, a separate activity rate (i.e., predetermined overhead rate)is computed for each activity cost pool by dividing the estimated overhead cost in the activity cost pool by the total expected activity for the activity cost pool.

Activity Cost Pool

A grouping of all the costs related to a particular activity in the activity-based costing method.

Activity Rate

An overhead rate in activity-based costing. Each activity cost pool has its own activity rate which is used to assign overhead to products and services.

  • Gain an understanding of the function and relevance of an activity measure in the apportionment of overhead costs within activity-based costing.
verifed

Verified Answer

MM
Madison MenicucciMay 03, 2024
Final Answer :
True
Explanation :
This statement is correct. An activity rate is calculated for each activity cost pool by dividing the total estimated overhead cost in the pool by the total expected activity in that cost pool. This helps to assign overhead costs more accurately to products or services based on the activities they require.