Consider the following statements about support department cost allocations.
i. In a modern manufacturing environment, it is not necessary to allocate support department costs.
ii. Support department cost allocations continue to be necessary when a highly automated system is in use.
iii. In a flexible manufacturing system, the need to allocate costs diminishes because more costs have become traceable to the product.
Which statement/s is/are true?

A) i
B) i and ii
C) ii and iii
D) i, ii and iii

Support Department Cost Allocations

The distribution of overheads and expenses from support departments to operational departments based on criteria reflecting their use of support services.

Modern Manufacturing Environment

Refers to the current state of manufacturing characterized by advanced technologies, lean production methods, and increased emphasis on sustainability.

Highly Automated System

A system incorporating advanced technologies to minimize human intervention in its operations.

  • Comprehend the critical role and methodologies of cost distribution in the fields of accounting and management.
verifed

Verified Answer

O&
Oscar & Clarisol MejiaMay 23, 2024
Final Answer :
C
Explanation :
Statement i is false because support department cost allocation is still necessary even in a modern manufacturing environment. Statement ii is true because highly automated systems require greater support department costs, such as IT and maintenance. Statement iii is also true because flexible manufacturing systems allow for more direct tracing of costs to the product, reducing the need for allocations.