Asked by Rebecca Dooley on Jul 16, 2024

verifed

Verified

An operation in a television factory has an average observed time of 6 minutes. The performance rating of the worker timed was estimated at 90%. Practice in this department is to allow 8% for the constant allowances. Currently, there is no variable allowance.
a. Find the normal time for the operation.
b. Compute the standard time for the operation.
c. Recompute the standard time if a variable allowance of 8% is factored in.

Constant Allowances

Fixed sums or quantities that are allocated regularly, such as allowances in budgets or time estimations in project management.

Performance Rating

A quantitative assessment often used to evaluate the efficiency, output, or success of an individual, system, or organization in achieving its objectives.

Normal Time

The average time that a worker takes to complete a specific task under normal working conditions, considering both productive and unproductive time.

  • Derive the ordinary period for specified activities by investigating recorded times and performance rankings.
  • Gauge the standard span for procedures, including permanent and alterable allowances.
  • Revise baseline durations with changed allowances to fathom the repercussions of alterations in the values of allowances.
verifed

Verified Answer

RG
Randi GovantesJul 18, 2024
Final Answer :
a. Normal time = 6 minutes × .90 = 5.4 minutes
b. Standard time = Normal time  1 - Allowance factor\frac{\text {Normal time }}{\text { 1 - Allowance factor}} 1 - Allowance factorNormal time  = 5.41−0.08\frac { 5.4 } { 1 - 0.08 }10.085.4 = 5.87 minutes
c. New standard time = Normal time  1 - Allowance factor\frac{\text {Normal time }}{\text { 1 - Allowance factor}} 1 - Allowance factorNormal time  = 5.41−0.16\frac { 5.4 } { 1 - 0.16 }10.165.4 = 6.43 minutes