Asked by Dalton Regier on May 12, 2024

verifed

Verified

​A landscaping firm brought three trucks loaded with topsoil to a job site. Two trucks carried 7.75 cubic yards each, and one truck carried 5.25 cubic yards. When the job was finished, 3.5 cubic yards remained. Find the number of cubic yards used.

Cubic Yards

a unit of volume measurement, especially for measuring materials like soil or gravel, equivalent to the volume of a cube with sides of one yard.

Topsoil

The uppermost layer of soil, which is fertile and rich in nutrients, important for plant growth.

Landscaping Firm

A business that specializes in modifying the visible features of an area of land, including living elements, terrains, and structures.

  • Employ basic numeric operations, including addition, subtraction, multiplication, and division, to resolve everyday challenges.
  • Accurately compute sums, subtractions, and mean values in diverse scenarios such as sales, stock levels, and measurements.
verifed

Verified Answer

AD
Ashlie DumesleMay 13, 2024
Final Answer :
7.75 + 7.75 + 5.25 = 20.75 cubic yards; 20.75 - 3.50 = 17.25 cubic yards